Indexes of output per man-hour: steel industry, 1947-65. by United States. Bureau of Labor Statistics.

Cover of: Indexes of output per man-hour: steel industry, 1947-65. | United States. Bureau of Labor Statistics.

Published in [Washington] .

Written in English

Read online

Places:

  • United States.

Subjects:

  • Steel industry and trade -- Labor productivity -- United States.

Edition Notes

Book details

SeriesBLS report ;, no. 306
Classifications
LC ClassificationsHD8051 .A7876 no. 306
The Physical Object
Paginationiii, 25 p.
Number of Pages25
ID Numbers
Open LibraryOL5560991M
LC Control Number67060674

Download Indexes of output per man-hour: steel industry, 1947-65.

Get this from a library. Indexes of output per man-hour, steel industry, [United States. Bureau of Labor Statistics.]. Europe. Output of recoverable lead and zinc per man-hour fell 12 percent between andalthough output of ore per man-hour increased nearly 5 percent between the same years.

In coal piining, production of crude petroleum and natural gas, iron mining, and copper mining, productivity in was higher than in Output Per Man-Hour Output per man-hour is define4 as real output divided by man-hours and is expressed as an index number with —59 equal to Aver-age weekly hours are a weighted average of the hours of wage and salary workers and the hours of the self-employed.

The weights applied were TABLE J-2 Specific Cycle Turning Points Series Author: Victor R Fuchs. tion is consistent with the trends in capital (in prices) per man-hour worked and in manhours per unit of output.

Man-hours per unit of output — the reciprocal of "labor produc-tivity" — are reduced whenever labor is replaced by other factor inputs or whenever other factor inputs operate more efficiently if.

of Output Per Man-Hour, Gas and Electric Utilities Industry, (April ). 6 "Trends in Output Per Man-Hour in Selected Industries: Petroleum Refining," Monthly Labor Review, Novemberpp. ; also published as Indexes of Output Per Man-Hour in the Petroleum Refining Industry, ().

O - 65 - 4. Variable costs (particularly labor) gradually increased over time without a concomitant improvement in output per man-hour.

Finally, two decades later, the price of the output being created with the old technology could not offset current cash outlays for variable costs and U.S. Steel could no longer economically justify maintaining operations. A contractor determines that the unit productivity for painting a wall is hour per m2.

If the local wage rate including burden and fringe benefits is LE30 per hour, the unit labor cost becomes LE per m2. If the wage rate is LE20 per hour, the unit labor cost becomes LE11 per m2. In addition, productivity performance between. In this method, the steel is heated locally by a pressurised mixture of oxygen and a combustible gas such as propane, which passes through a ring of small holes in a cutting nozzle.

The heat is focussed on to a very narrow band and the steel melts at C when a jet of high-pressure oxygen is released through a separate hole in the centre of the.

Structural steel arrives at the job site as a fabricated, ready - to - assemble product. However, prior to delivering the steel to the project site, a considerable amount of activity is undertaken by the steel fabricator (steel contractor). The fabricator has the following primary responsibilities as identified below: 1.

Order/purchase steel 2. It could be used to monitor the labor performance, or to estimate the manpower required for a project for planning and monitoring purposes or for cost estimations.

In this article i will share with you civil works production rates excel sheet where you can find all the civil works related items along with the average productivity per profession.

Every business owner, manager and department head shares the concern of getting the maximum output with the minimum input. Outputs can be anything from furniture to software to hours of service. Inputs can range from raw materials to machine time to hours of labor.

The ratio of outputs to inputs is known as productivity. These rapid advances in European and Jap- anese productivity reflect not only the re- building of industrial plants destroyed during s Belgium's productivity data were based upon blue- collar workers, and thus tend to exaggerate increases in output per man-hour.

9 It should be noted that the discussion is in terms of percentage changes and does. Ge n e r al Carpenter Fo r eman $ per hour Carpenter Fo r eman $ per hour Jo u r neyman Carpenter $ per hour L a b o r er $ per hour Truck Dri v er $ per hour Note: General foreman and foreman are dead weight since they do not work with their tools; however they must be considered and charged to the composite crews.

The construction industry of India is the second-largest contributor to the GDP and provides employment to a large population in the country. Its contribution to the GDP is about % on an. Indexes of Output Per Man-Hour for--Private Economy, January (Free). Selected Industries, and (Bulletin), 50 cents.

Footwear Industry, July (Free). Gas and Electric Utilities Industry, April (Free). Man-Made Fibers Industry, October (Free). Primary Aluminum Industry. Krishnan () focuses on inputs such as labour, ship launching, shop floor area and total shipyard area. Pires et al. () also present production cost, building time and quality as basic.

Harrison () describes the following index types: â ¢ Input price indexes (e.g., Engineering News Record building and construction cost indexes) â ¢ Output price indexes (see Table C.4) â Disaggregate â Aggregate â ¢ Quality indexes â ¢ Hedonic indexes â ¢ Wage rate indexes â ¢ Industrial product indexes.

Manhours per Unit and the Craft performing the work are listed in the “[email protected]” column. Pages 7 through 9 explain the “[email protected]” column. To find the units of work done per man in an 8-hour day, divide 8 by the manhours per unit.

To find the units done by a crew in an 8-hour day, multiply the units per man per. Indexes of Output per Man-Hour for Selected Industries, and Annual Industry Series (December ), 21 pp. Free.” "Indexes of output per man-hour, output per employee, and unit labor requirements for 22 industries, including coal and metal mining, various foods and fibers, basic steel.

L Indexes of Output per Man-hour Selected Industries, and   L Price Perspective   L Union Wages and Hours: Local-Transit Operating Employees   L Union Wages and Hours: Building Trades   L Union Wages and Hours: Motortruck Drivers and Helpers.

Moreover, output per man hour had not increased by more than 2 per cent annually over the last six years in the steel industry, it said, although employment costs rose about 5 per cent annually in. developments in the construction industry in order to ensure reliable, thorough, and up-to-date cost information.

While overall construction costs may vary relative to general economic conditions, price fluctuations within the industry are dependent upon many factors. Individual price variations may, in fact, be opposite to overall economic.

Engineering and ProcessEconomics 2() Elsevier Scientific Publishing Company, Amsterdam - Printed in The Netherlands SPECIFYING ESCALATION INDEXES TO AID IN PROCESS PLANT COST FORECASTING Paul H. Earl Data Resources Inc., K Street, N. W., 9th Floor, Washington, DC (U.S.A.) Abstract Presented in this paper are specifications.

Indexes of Output per Man-Hour for Selected Industries. and Annual Industry Series (October ), 44 pp. Free. Indexes of output per man-hour, output per employee, and unit labor requirements for 22 industries, including coal and metal mining, various foods and fibers, basic steel, etc.

Productivity (ie, output per person employed) was about the same in Britain, France and West Germany inwith Britain marginally highest. Output per man-hour in manufacturing industry. The capacity is a function of the output units used in the measurement as well as the size of the equipment and the material to be processed.

The cycle time T refers to units of time per cycle of operation. The standard production rate R of a piece of construction equipment is defined as the number of output units per unit time.

Hence. Productivity measures and related cost measures are designed for use in economic analysis and public and private policy planning. The data are used in forecasting and analysis of prices, wages, and technological change. Webpages on this Topic Labor Productivity and Costs Output per hour and unit labor costs for the U.S.

business sector, nonfarm business sector, and manufacturing sector. You can write a book review and share your experiences. Other readers will always be interested in your opinion of the books you've read.

Whether you've loved the book or not, if you give your honest and detailed thoughts then people will find new books that are right for them. Free ebooks since   Crude steel production for the 64 countries reporting to the association was million tonnes (MT) in Januarya per cent increase compared to Januaryreport said.

The world's largest steel producing country, China, reported a crude steel output of MT in January, an increase of per cent compared to the year-ago period. For example, in Table 1, the costs per pound for UltraCore 70C are shown and indicate that it is more economical to use 5/64 in diameter than it is to use 3/32 in diameter (at 60 percent operating factor the cost per pound of weld metal is $, versus $).

This is because at amps, the deposition rate for 5/64 in diameter UltraCore 70C. Steve, Need some more information, what is the welding process tig (GMAW) or stick (SMAW) carbon or stainless. Also need to take into consideration handling, cutting, prepping, labor climate, some welders are faster/slower then others etc.

Are you estimating a big job and plan on inputing the time that you and your managment come up with, anyway be careful I was recently burnt by a very. Indexes of Output per Man-Hour for Production Workers, Selected Industries: to Production of Gold and Silver in "The World" since the discovery of America Population by Selected Ancestry Group and Region: School Enrollment: to Steel Structures Painting Council, Pittsburgh, PA John Meyer, U.S.

Government, use the Table of Contents at the front of the book or the Index at the back of the book. Once you’ve found the right table and the appropri- ductivity, material coverage, material cost per gallon, hourly labor cost, labor burden, overhead and profit.

Item 1: Indexes of Output per Person Employed and Per Man-Hour in Canada Commercial Nonagricultural Industries Format: Publication Author: Dominion Bureau of Statistics.

Output per man-hour in the manufacturing sector, which had been rising at an annualized rate of % through the early years of the 20th. United States. Bureau of Labor: Comparisons of indexes of labor and nonlabor payments, prices and output per man-hour in the total private economy and the private nonfarm sector, (New York: U.S.

Dept. of Labor, ), also by United States Department. The United States Steel Cor poration announced that Mr. Tyson would be succeeded as chairman of fits finance com mittee at the end of August by. China, Japan, India account for 64% of world steel production in August 22 Sep,PM IST The top three steel makers produced MT against the global output of MT.

China is the world's largest steel producer followed by Japan and India. In his book, The Basics of Benchmarking, Robert Damelio points out, “A common misconception is that there are lists or databases of universally accepted best practices for a given industry, function, or process.

But what makes a given practice better than another. Calculating man hours involves determining how much time a project requires and how many employees are needed. The process can be completed before or after a project, and this example determines man hours after a project's completion.

Productivity-improving technologies date back to antiquity, with rather slow progress until the late Middle Ages.

Important examples of early to medieval European technology include the water wheel, the horse collar, the spinning wheel, the three-field system (after the four-field system—see Crop rotation) and the blast furnace.

All of these technologies had been in use in China, some.Man-Hours per Unit of Output in U.S. Basic Steel Industry—Suggest Learning Curve Decline – Source: BulletinWashington, U.S. Department .The index of industrial production rose forty noted, distort the results, In the United States steel industry, several firm squeeezed out water from the original book value of Eckaus and would attompt to get man-hour inputs of labor and capital per unit of the same output over the same time by .

42845 views Saturday, November 14, 2020